Begin with the perimeter function and route
Runway boundaries, cargo areas, maintenance zones and controlled service roads can require different visibility, access and interface details.
- Send the perimeter length, corners, level changes and gate schedule.
- Identify controlled zones, public-facing sections and maintenance access.
- Name the project specification or authority requirements that govern the design.